< Research | Similar Projects >
Client: Beacon Capital Partners
Architect: Jacobs
Location: Houston, TX
Delivery: Construction Manager-at-Risk
Status: Completed
Dynamic One’s ninth level boasts three state-of-the-art lab suites, each offering a dedicated office, conference room, and laboratory space. The suites were designed for efficiency and safety, featuring fume hoods in every lab, providing researchers with essential protection from hazardous fumes and chemicals. Each conference room includes acoustical wall panels to minimize noise and promote focused collaboration. Additionally, demountable glass partitions throughout the labs create a bright and welcoming environment for researchers.
Our team encountered long lead times for essential components, including specialized lab valves, critical for controlling airflow within the ventilation systems, and demountable glass partitions, allowing ample visibility and natural light. To ensure the project’s continued progress, we prioritized tasks that could be completed with readily available materials. Upon arrival, we swiftly installed the materials, completing the entire floor construction within nine months.
1,611,720 SF site development
259,000 SF research laboratory
490,000 SF office building
644,589 SF parking garage